Logic Model Template for Evaluation

ADS

Premium
Premium license
Personal & Commercial use
Attribution
Not required

Project evaluation is a highly complex exercise considering the multiple variables and aspects/factors you have to examine. A logic model is the perfect tool to assist with this process. This is because it visually displays the thinking (rationale) behind the program design and your theory of change – how project activities and inputs transform into desired change (outcomes and impact). This way, you can identify how each separate piece fits into the larger project so that you can determine the project’s success.

Success can be in terms of development effectiveness, impact, relevance, and sustainability. For example, how well the project is using available resources, delivering desired outcomes, and meeting goals. Evidently, project evaluation can be time-consuming. Therefore, as a project manager, you should try to save time and effort wherever you can during this exercise. Instead of creating a logic model from scratch every time you need to evaluate a project, consider using a template.

A template comes with a premade logic model framework that can guide you on which components you need to evaluate. These components include the inputs, activities, outputs, and outcomes. Other aspects you included in this template are assumptions made and internal/external factors affecting the implementation of the project. 

How to use this Template for Project Evaluation

Through research, we identified what aspects you need in a logic model to explain comprehensively the flow from project activities to results. Therefore, each component of this template has a significant role in evaluating projects that you need to understand before using the model. Here is a breakdown of the components and why you need them during project evaluation:

Project description

A description gives an overview of what the project is all about. A good description will indicate the objectives and target audience. It helps associate the logic model with a specific program/project. The first step in evaluation is understanding what the project is. Note that multiple people may need to use the evaluation from program staff, investors, stakeholders, and public officials to partners. 

To fill this section, be precise and provide unique identifying details. Remember, projects are typically complex, if you want to focus on a specific aspect, component, phase, or scope, make sure your description is narrowed down to this focus point. 

Inputs

Inputs include all the resources you need to actualize the program. These range from funding, program staff, facilities, and materials and equipment. It is important to understand which resources are available so that you can assess your firm and team’s capacity to implement the project. In addition, these inputs will be highly significant in certain evaluation procedures, such as measuring the program’s ROI (return on Investment). 

To fill this section, first audit every resource available for the project. Then, enlist each resource in the respective categories. For example, under program staff, you can enlist the number of experts needed, volunteers, partners, administrative workforce, etc.

Activities

Activities are the actions and processes the project needs to achieve the desired results. Understanding the activities helps evaluate the “work” done and the path taken to achieve the said results. Identifying all the tasks to be done, you can create a WBS (work breakdown structure) and work schedule that measures project progress and assesses if the team has adequate capacity to implement the project. 

When filling this section, identify all the tasks that each team or department needs to do and categorize them appropriately. You can have activities for project delivery (core tasks and processes), capacity building, outreach, marketing, etc. Therefore, you can enlist activities like construction, workshops, surveys, staff recruiting and training, grant writing, fundraising events, data analysis, report writing, etc. 

Outputs

Outputs represent products that directly result from the activities you enlist. Typically, they are quantitative; you can measure by volume, scale, or reach. They are a measure of work done and not of change or impact achieved. By identifying the outputs, you are able to determine if proper resource management practices were adopted, that is, available money, time, and staff were utilized effectively. 

To fill this section, review the activities and identify what resulted from them. For example, if the activity was to feed the homeless in City A, the output can be 200 meals were served in City A homeless shelter. If the activity was to ‘hold fundraising events,’ the output can be ‘2 fundraising events were held in August.’   

Outcomes

Outcomes are the changes and benefits the project brings to the target audience. This is what you use to measure the success and value of the project and your team’s effectiveness. Outcomes are majorly qualitative and quantitative in some cases. 

To fill this section, you need to record the short-term, intermediate, and long-term impacts and enlist them accordingly. The outcomes must directly relate to the project objectives and goal. For example, if the project was to feed the homeless in City A, some outcomes may include satisfied people (short-term), improved health among the homeless (intermediate), and more productive community (long-term). Once you identify the benefits, then you can perform procedures such as the BCR (Benefit-Cost-Ratio) to determine if the benefits received outweighed the resources used. 

Assumptions

The logic model includes assumptions on why and how the program should work. The assumptions help establish which variables need to be present or true for the logic model or theory of change to achieve the intended goal. They help with decision-making. 

To fill this section, consider key variables and their influence on the project’s outcome. For example, a feeding program, examples of assumptions can be homeless individuals will be willing and committed to participate in the program and the necessary funding will be available.  

External factors

External factors are variables beyond the project implementers’ control that can affect the implementation and success of the project. For a comprehensive evaluation, factors may be assessed, including economic conditions, climate events, cultural attitudes and behaviors, policies, and political climate. These factors help evaluate dependencies between events and project implementation and identify the risk management approach adopted. This way, you can identify sources of bottlenecks, delays, and deviations from the desired outcomes. For example, for a construction project, external factors may include natural disasters that hinder the transportation of materials and delay on-site work. Other examples include price of goods, government policies, a pandemic like COVID-19, political unrest, etc. 

Available Formats

We offer this logic model for evaluation template in various formats including DOCX (Word Document), DOTX (MS Word Template), Google Docs, and ODT (OpenDocument Text). This is to make it accessible to a wider audience as each version provides some unique features and functionalities.

For instance, if you will be collaborating with multiple people to evaluate a project, the Google Docs version may be more befitting. It allows you to share the logic model with team members, where everyone can work on it remotely.

The ODT version is compatible with multiple applications and may be suitable if you are using open-source software to evaluate the project. All versions are readily customizable. Feel free to modify labels to suit your projects and add extra items you need to improve your evaluation. In addition, you can brand the logic model by modifying the text and color to reflect your brand and adding your firm’s logo and mission statement.